The National Transmission and Despatch Company (NTDC) that runs the country’s national grid has sought approval for a Rs370 billion investment plan for system expansion and loss reduction over the next three years (2023-25). In a petition to the National Electric Power Regulatory Authority (Nepra), the transmission system operator stated that the proposed investment was required to meet the nee